Your Hot Water Service now requires a lockable isolator switch beside it and a Safety Switch installed at the switchboard

Faulty - Hot Water Service
-
We replace Hotwater Elements / Thermostat's


Your Plumber may need to replace the Anode in your Hot Water Cylinder, these are often checked every 5 years     

Load Control Economy Tariff  3900 is for  your Hot Water Cylinder. 

Super Economy  Tariffs 9000 is for  aslo for your Hot Water Cylinder

Load Control - Will require the installation of dedicated power circuits run back to your Main Switch Board and the required  Control wiring will  also be installed in preparation for the Metering Providers  additional  Meter and Riple Relay.


 
These dedicated circuits which  are run all the way back to your Main Switchboard including the requirement for us to fit additional Safety Switches
to each of these new circuits you may need us also to install a contactor and additional control wiring,

Keep in mind  also that you may need  to have installed an additional Meter at your Meter Panel,
plus the Load Control Relay. Which would mean  that you will be up for Additional  Charges by Your Metering Service Provider who now fit There Equipment At A Cost To You. (Remember to go on line with your Power Authority and complete the Connect Application Form or ask us to help you complete your application-Online


Older Meter Pannels / Main Switch board : Require replacement and  relocation to be able to proceed with this type of work upgrading is manatory  
The specifications requirements are mandatory & some times the work involved out ways any econnomoic reason for proceeding  ito inststal  Load Control Tariff's

 