Concrete Pads Underground Wiring Systems Minimum of 75 mm thickness

This information is here to help the Builder understand the major changes in  the Under Ground Wiring Systems around the Site and the Main Building Concrete Slabs and the what would happen if the  Main  Building Slab is not of continous thickness of 75 mm covering.

The Different Installation Methods Associated to the Under Ground Cable Systems  related to  the Concrete Cover and External to the Main Building  and  to the Main Building Changes  from 1 July 2018 are significantly more detailed and require more time for installation.