RJ for Light & Power

Swimming Pools Spa Multipule Bonding Earthing Requirements

26 Feb 2018 From Electricial Safety Office (Information here to help the Builder . More updates available for the Builder via the National Construction Code of Australia) Requirements of conductive pool structures bonding connection point bonding of all conductive parts of the pool or in arms reach as detailed in ASANS 3000:2018 
1 July 2018

The following work of installing Bonding Cables and Equipotential Test Point is the job for Electrical Contractor & there Qualified Electrical Mechanics Only. Tie wires on the conductive reinforcing  of the pool structure and the surounding area of the pool or spa  is the job of the Builder, Testing that it is all continous is the job of the Electrical Contractor and the various contections of the bonding wires to the reinforcing is the job of the Electrical Contractor. Electrical Contractor is to ensure it is all continous and is connected back to the Test Point as per the test requirements.


New Extensive Rules now apply from 1 July 2018 Refer to  all the detail in AS / NZ 3000:2018 Section 5




This website was created for free with Own-Free-Website.com. Would you also like to have your own website?
Sign up for free